UK government health regulator

Phased migration of about 100 servers to Azure with little to no downtime

Context
A UK government health regulator needed to move its server estate, about 100 servers, out of an on-premise data centre.
What was done
Designed and delivered a phased migration to Azure, following GDS cloud-first principles. A Citrix based data portal was also redesigned onto Azure Virtual Desktop.
Result
The migration was delivered with little to no downtime to business operations.

UK government health regulator

A trusted research environment on Azure for secure healthcare data research

Context
The regulator needed a secure way for researchers to analyse sensitive healthcare data.
What was done
Designed a trusted research environment on Azure, based on Microsoft's open-source TRE. Added a multi study licence secure workspace model with access to Azure Synapse.
Result
The single study licence went live in April 2024, with the multi study licence secure workspace model added to the same design.

UK government health regulator

Remediation of IT Healthcheck findings across three centres, leading to accreditation

Context
The regulator needed to close IT Healthcheck findings across three centres.
What was done
Owned the remediation across the three centres.
Result
Public Sector Network accreditation was gained and Police National Database certification was achieved.

UK government health regulator

A 60% cut in annual data centre operating cost, a saving of £320K

Context
The same regulator wanted to reduce the cost of running its data centre estate.
What was done
Carried out rack moves and decommissioning, and renegotiated contracts, as virtualisation and cloud migration reduced the footprint.
Result
Annual data centre operating cost fell by 60%, a saving of £320K.

UK local authority

IT operations brought under ITIL control, with 350+ virtual servers migrated

Context
A UK local authority needed to bring IT operations under control for more than 3,500 users.
What was done
Directed IT operations of more than 50 staff. Introduced ITIL incident, change and problem management, with a configuration management database and service catalogue. Live migrated 350+ virtual servers to a new hosted data centre.
Result
The virtual servers moved to the new hosted data centre, with ITIL practice in place to run the service.

Global investment bank

A 30% fall in P1 and P2 network incidents, and a 15% saving

Context
A global investment bank ran network operations across the Americas, Asia Pacific, EMEA and Latin America.
What was done
Brought vendor management in-house and ran 24/7 follow-the-sun network operations across all four regions.
Result
P1 and P2 network incidents fell by 30%. Year-on-year cost fell by 15%, a saving of US$1M.

Global investment bank

About 30% less operations workload through automated ticketing

Context
Operations teams at the same bank carried a high volume of manual tickets from infrastructure and application events.
What was done
Automated ticket creation and escalation from infrastructure and application events.
Result
Operations workload fell by about 30%.